This construction project comprises of alterations and refurbishment of over 3,000 sq ft of Cat B of the existing level 4 floorplate within the Capital Building
The full works comprised:
- Strip out works – Ceilings, floor coverings
- Remove existing M&E services i.e., luminaires, fire alarm, security, data, vent, power, pipework
- Fit electrical luminaires to the project including power, security, data and fire alarm to all areas
- Fit all new mechanical vent, pipework, above ground drainage and tie in were required
- Supply and fit suspended ceilings, plasterboard ceilings and new door kits where required
- Install new/old tea-preps
- Supply and fit new glazed Komfort screens, new skirtings and facings to match existing
- Decoration, including ames taping/prep work to all walls and ceiling surfaces
- Install all new wall coverings
- Supply and fit new floor coverings and install new wall tiling
The client and their design team have created a flexible and professional working environment for SLCC. The organisation is downsizing its office space, following a substantive programme of work to develop new ways of working, investment in upgraded IT infrastructure and a drive to digital to improve efficiency and reduce the need for physical storage. The move will achieve a £500,000 saving in costs over the next five years.