Case studies

filter by

  • All
  • Bespoke Joinery
  • Projects

Paolozzi Bar & Restaurant

The project was the conversion of banking premises into restaurant with ancillary bar. Works to front elevation and building fabric including alterations to structure, recovering of rear roof. The project involves replacement and upgrading of services along with the supply and fit out of bespoke…

Buckstone Primary – James and the Giant Peach

Our Bespoke Joinery team manufactured the James and the Giant Peach Tree in-house in our 25,000sq ft production facility. Installed in Buckstone Primary School, the pod provides a tranquil space for the children to learn and play.  SJS are delighted to bring Lesley McMillan’s ideas…

Opus 2 Office Refurbishment

The project comprised of the alteration and refurbishment of second floor office space to create updated and modernised facilities for the end user client Opus 2. The works comprised of the removal of the existing partitions and installation of new to subdivide the large open…

Cushman & Wakefield Office Refurbishment

The project included minor refurbishment works to the main reception area and office alterations for Cushman and Wakefield in Edinburgh.  The project included the installation of new flooring, bespoke manufactured joinery including feature wall panelling and decoration throughout. To the rear of the office, SJS...

Dalhousie Land, University of Edinburgh

The project comprised of the alteration and refurbishment to the third floor of Dalhousie Land to house The University of Edinburgh’s HR department. We aligned the space which was previously separated over two floors to create a large open plan office. Glazed partitions were installed…

Gleneagles Hotel Refurbishment

Ballroom, Billiard Room and Parlour The project comprised of refurbishment works to three separate rooms, the Ballroom, Parlour and Billiard Room within the main hotel complex of the prestigious Gleneagles Hotel, Perthshire. Works included the stripping out, installation of manufactured joinery, floor, wall and ceiling...

CoDE Pod Hostel, Dublin – Bespoke Joinery

The contract involved the design and manufacture of 384 bespoke pod style beds and headboards for Main Contractor, Vision Contracting as part of their project at CoDE in Dublin. The manufactured joinery was produced in-house in our Newhailes facility and shipped nearly 300 miles away…

Tuffin Ferraby Taylor – Office Refurbishment

The project comprised of a Catergory B fit out and refurbishment of office space for TFT within Exchange Place, Edinburgh. The works comprised of a full fit out to create a well-being oriented office space including the installation of new feature lighting, M&E modifications, kitchen…

University of Edinburgh, Lecture Theatre Refurbishment

Located in The University of Edinburgh’s Ashworth Laboratories, SJS undertook the refurbishment of Lecture Theatre 1 to upgrade and modernise the facilities. The project included downtakings, M&E installations and decoration works throughout. A notable aspect of the project was the refurbishment of B-listed timber fixed…

Office Fit Out, Exchange Plaza

The 18,000ft2 project comprised of a full strip out and subsequently the CAT A office fit out within Exchange Plaza, Edinburgh. The works comprised of the strip out of former tenant fixtures and fittings along with suspended ceilings and floor finishes. The suite was thereafter…

Office Refurbishment, Hub South East

The small-scale refurbishment project for Hub South East comprised of internal alterations and the redecoration of office space over 4 floors at 8 Melville Street, Edinburgh. The works provided a refreshed and modern environment with the installation of both glazed and plasterboard partitions to optimise…

Office Refurbishment, Umega Lettings

The 3000 ft sq office refurbishment comprised of the CAT A enabling works and CAT B fit out for Umega Lettings in Lister Square within the heart of Edinburgh’s Quartermile Development. The project provided modern, high quality facilities for the letting agency and included the…

Roof Terrace, One Lochrin Square

The construction project comprised of the installation of a 250m2 terrace and fire exit on the 4th floor of commercial offices at One Lochrin Square, Edinburgh. The project was delivered within a live environment with the business remaining fully operational, regular communication with the Building…

BT Murrayfield

The project comprised of the strip out and refurbishment of the National Team’s changing area and shower room to create new, modernised facilities – complete with the design, manufacture and installation of bespoke manufactured joinery for BT Murrayfield. The project took place over 2 phases…

Office Refurbishment, Edinburgh Business School

The alteration and fit-out project optimised the use of existing office accommodation for the Edinburgh Business School, Heriot Watt University. The works included the installation of partitions – creating 12 glass fronted cellular offices, a new tea prep area and the design, manufacture and installation…

Vita Student, Fountainbridge

The contract involved the production of bespoke manufactured joinery for main contractor Bowmer & Kirkland as part of their refurbishment and fit-out at Vita Student, Fountainbridge. These items were installed into the communal hub of the student accommodation and ranged from a striking concrete fronted…

Residential Refurbishment, Thistle Street Lane

The construction project compromised the subdivision, conversion and alteration of a 6 storey office block into 11 residential flats at 45A George St, South West Thistle Street Lane. The project was delivered over 1 Phase in the busy City Centre. The building directly below the…

Learning & Teaching Spaces – Heriot Watt University

This construction project consisted of the interior upgrading of 13 existing Learning and Teaching rooms within 8 buildings throughout the Heriot Watt campus. As the 13 refurbished rooms were spread throughout the 380 acre campus, this required careful planning and site communication The project was…

Lecture Theatre Refurbishment, Queen Margaret University

The project involved the refurbishment and alterations of a lecture theatre to allow for a desired shift in orientation. The 4 week project was successfully delivered over the academic summer, ready for use at the start of the first semester The full works comprised: • Strip…

Classroom Refurbishment, University of Edinburgh

This project involved the refurbishment of Esala Rooms (Studio 4 and 5) and Elliot rooms teaching areas for the University of Edinburgh’s, Minto House. The full works comprised: • Down takings and removal of existing electrical supplies and containment including lighting • New containment dado trunking, lighting,…

Classroom and Laboratory Refurbishment, University of Edinburgh

The contract involved the alteration and refurbishment of the Computer Teaching Lab and the Powerlab labratory in the University of Edinburgh’s, Fleeming Jenkins building. The full works comprised: • Down takings and removal of existing walls, ceilings and floor finishes • Removal of existing binnacle…

Student Accommodation Refurbishment, Heriot Watt University

The project involved the refurbishment of the Lord Thomson Halls student accommodation for Heriot Watt University. This included alterations to 203 bedrooms, over 40 kitchens, 4 staircases, corridors, 3 lift lobbies and 2 warden flats. The full works comprised: • Removal of redundant furniture, including existing…

Semple Street, Edinburgh

SJS provided a bespoke joinery package for the main contractor McLaughlin & Harvey at 2 Semple Street, Edinburgh. The manufactured works comprised: • Feature lacquered wall panels and ceilings rafts • Seating booths • Fire control cabinet The manufactured joinery on this project was produced…

Cairn Housing Association, Edinburgh

SJS provided a bespoke manufacture joinery and installation package for main contractor, Space Solutions at Cairns Housing Association, Edinburgh. The manufacture works comprised: • Timber tea preparation screens with clear satin finish • Push latch lockable cupboards with adjustable shelves • Double and single booth…

Murrayburn Primary School, Edinburgh

The design, install and manufacture of furniture and shelving for City of Edinburgh School, Murrayburn Primary School. The classroom additions were produced using FSC certified birch plywood and were finished with a clear lacquer. The manufactured works comprised: • Carpet lined circular and house shaped…

Residential Refurbishment, 5 Melville Crescent

The project compromises of an interior strip out and refurbishment of existing 5-storey property at 5 Melville Crescent, Edinburgh. The full works comprised: • Removal of existing floor finishes,  kitchen and toilet facilities • Removal of both non-load bearing and load bearing walls to create new spaces…

Residential Refurbishment, Stafford Street

The work comprised of the conversion and reconfiguration of offices over three floors into two luxury residential apartments in the West End of Edinburgh The full works comprised: • Removal of existing floor finishes, kitchen and toilet facilities • Removal of existing non load and…

Cafè Refurbishment, Oriam Bistro

The 6-week project involved the strip out, alteration and refurbishment of the Oriam Bistro within Scotlands Sports Performance Centre, Heriot Watt. The aim was to create a multi-functional cafe and adjoining meeting room space for students and club members within a relaxed and comfortable surrounding….

Office Refurbishment, Edinburgh Business School

The project comprised of the alteration and refurbishment of the first floor and central atrium within the Edinburgh Business School at Heriot Watt, Riccarton Campus. The project involved the alteration and refurbishment of the first floor and central atrium. This optimized the use of existing…

Room & Reception Refubishment, Bruntsfield Hotel

The design and build project comprised of the refurbishment of the reception and desk area of the hotel and transformation of offices and toilets into new apartment suites for guests The full works comprised: •  Upgrading works to entrance, lounge and reception •  Various internal…

SHOWER AND HALL REFURBISHMENT, UNIVERSITY OF EDINBURGH

The design and build project involved the refurbishment works of a corridor and two toilet facilities within Old Surgeon’s Hall, Edinburgh University. This provided the staff and students with updated and modern facilities. The full works comprised: • Strip out existing cubicles, floor coverings, wall…

VITA Student Accommodation, Newcastle

SJS provided the bespoke furniture for the main contractor Wates Construction for their refurbishment and fit-out of VITA Student accommodation in Newcastle. All elements were designed, manufactured and installed by the SJS team. The main focal point of this project was the Corian and hardwood…

New Showroom Fit-Out, Richard F McKay

The project involved the fit-out of a new build industrial extension to provide a luxury modern designer kitchen showroom for Richard F McKay in Edinburgh. The full works comprised: • Installation of new partitions to form offices and kitchen display areas • Formation of new…

New Laser Laboratory, Scott Russell Building, HWU

The project involved alterations and transformation of an existing computer lab and offices to the ground floor of a 4-storey University building to form a state of the art Laser Lab facility within the ground floor of the Scott Russell building within the University’s Riccarton…

CMB Print Pod Conversion, Chrystal McMillan Building, UoE

This project involved the alterations and refurbishment to an existing under utilized print room, to form a modern enclosed meeting facility and shared office environment. The full works comprised: • Removal of existing fixtures and Fittings • Removal of existing M&E services • Internal finishes;…

School Boardroom, Sanderson Building, UoE

The works involved the alterations and refurbishment of existing office accommodation to form a new School Boardroom for The School of Engineering within the Kings Buildings Campus. The full works comprised: • Removal of existing fixtures and Fittings • Removal of existing M&E services •…

Lecture Theatre Refurbishment, Teviot Medical School

The works involved the alterations and refurbishment of the Meadows Lecture Theatre to improve the experience of students attending the Teviot Medical School. The full works comprised: • Removal of existing fixtures, fittings and stripping back wall, floor and ceiling finishes to bare shell •…

Teaching Space Refurbishment Joseph Black Building, UoE

The works comprise of alterations and refurbishment to two existing Lecture Theatres to create much improved , modern and vibrant teaching spaces. The full works comprised: • Downtakings and removal of existing lecture theatre seating, fixed furniture, ceilings and floors • New Internal Doors •…

Loretto School, Balcares House

The contract involved the alterations and the refurbishment of the girls boarding accommodation at Balcares House for Loretto School. The project was completed while the students were away during their 8 week summer holiday. The works comprised: • Timber flooring repairs • New sinks and…

Loretto School, Holm House

This design and build project involved the refurbishment of a 1970’s boarding accomodation at Holm House to provide updated modern vibrant facilities and living areas for the senior students whilst enhancing their experience and enjoyment during their stay. The works comprised: • Removal of existing…

Bank of Montreal, Edinburgh

SJS provided the bespoke furniture for the main contractor Sharkey for their refurbishment and fit-out of a commercial office space within the Quartermile complex in Edinburgh. All elements were designed, manufactured and installed by the SJS team. The main focal point of this project was…

Loretto School, Sports Hall

This design and build project involved the refurbishment of a 1970’s sports hall to provide modern and vibrant sports facilities incorporating the latest technology and sports equipment for the pupils and enhancing the experience and enjoyment for the pupils at school which excels in sporting…

Internal Alterations, Central Hall, Edinburgh

The project involved the Internal & external alteration and upgrading of the Dunbar Street entrance along with internal alteration, refurbishment and upgrading of the male and female toilets on the first floor. The full works comprised: • Removal and alterations to partitions • New External…

NG.10 Laboratory, Heriot Watt University

The contract involved the alterations & refurbishment of an existing double height laboratory space within the John Coulson Building of the Heriot Watt University Edinburgh Campus. The full works comprised: • Demolitions and Down-takings • Installation of a new structural steel mezzanine floor built off…

Gallery of Modern Art Refurbishment, National Galleries of Scotland

The contract involved the construction of an art delivery area in the conservation department, the refurbishment of office spaces, corridors, toilets, tea prep area and the provision of a new loading bay and associated services in the Modern 1 Building, Belford Road, Edinburgh. The full…

Quantum Packaging, Factory Refurbishment

This design and build project transformed a disused warehouse into a modern production facility for Quantum Packaging to produce airtight sealing products for food processing packaging. As well as providing clean and bright production area, the project including office and welfare facilities and a bright…

HMYOI Polmont, Scottish Prison Service

The Scottish Prison Service (SPS) has an on-going requirement to care for prisoners with dignity and humanity also extends to prisoners and their visiting families. The project involved the formation of a new meeting facility within the Main Entrance of HMYOI Polmont, in order to…

EH20, Office Refurbishment

The contract involved the alterations and refurbishment of an existing business centre in Edinburgh. The new modern and vibrant office suites and board rooms feature variable LED coloured lighting surrounds and bespoke furniture all designed and manufactured in our state of the art production facility….

Earl Mountbatten Building, Robotarium, Heriot Watt University

The contract involved the refurbishment of laboratory spaces in the Heriot Watt University Earl Mountbatten Building. The contract involved the complete refurbishment and alterations of corridors, entrances, existing high voltage labs and robotics labs to form a new human-robot-interaction (HRI)laboratory, land robot space, entrance way…

CYBG, Flagship Office, London

The contract involved the manufacture of consultation desks, booth seating, demonstration desks and a new kitchen for our valued client Sharkey for their recently completed CYBG flagship office fit-out in London. Interactive elements, demonstration screens and display materials had to be incorporated into the majority…

Cirrus Logic, Quartermile

SJS carried out the 10 week manufactured joinery package for the Cirrus Logic office fit-out in Edinburgh . The bespoke joinery items included; mobile booth seating, meeting pods, bench seating, panelling, credenza units and acoustic wall panelling. The manufacturing works comprised: • Bespoke storage units…

BA Gatwick Executive Lounge

We were awarded this prestigious 16 week contract to supply and manufacture high end bespoke FSC joinery for an Executive Lounge within the London Gatwick Airport. All of the wall panels and manufacturing furniture items were finished in fumed oak to the relevant fire rating…

Old Course Hotel, St Andrews

This 12 week contract involved the manufacture, refurbishment and installation of bespoke joinery elements and case goods for the prestigious and historic Old Course Hotel in St Andrews. In total over 1000 joinery items and case goods were produced and refurbished in our specialist manufacturing…

Cadzow Place, Edinburgh

The contract involved the alterations, refurbishment and fit-out of an existing retail property in Cadzow Place, Edinburgh. The existing interiors have been completely refurbished to create a bright and vibrant space which includes multiple offices, an interview room, a reception area and a conference room….

Hydra Cafe

The contract involved the alterations and the refurbishment of an existing cafe located within the Edinburgh Napier University Craiglockhart campus.   The full works comprised: • General down-takings including removal of existing tables and seating, all furniture, various fitments, existing flooring and all existing lighting….

Edinburgh Beer Factory

The contract involved the refurbishment of the front of house area, ground and first floor spaces to create a new cafe bar area, installation of new lift and refurbishment works on the first floor.   The full works comprised: • General down-takings and building alterations…

Changeworks, Phase 3, Edinburgh

The contract works involved stripping out an existing 3rd floor storage space and converting it into a modern office space for Changeworks to increase their primary Edinburgh office facilities.   The full works comprised: • Down taking of existing partitions and structural alterations • Forming openings…

Woodburn Primary School

The contract involved alterations to Woodburn Primary School, Dalkeith. Alteration were made to the existing partitions and creation of new partitions, rooms, doors and windows.   The full works comprised: • Strip out and downtakings • Structural Alterations to form new entrance doorway • Renewal…

Radisson Blu Hotel & Spa

With our in house state of the art manufacturing facility SJS helped install various elements to the 16th-century style facade, Radisson Blu Hotel & Spa, located in Edinburgh in the heart of the capital on the Royal Mile. The full works comprised: • Feature door…

Riverhill Cafe

This Restaurant and Bar fit-out project situated on West Nile Street, Glasgow delivered an exciting new restaurant and bar area complimenting the already established Riverhill Coffee Shop and incorporated key elements in the bar counter, drinks gantry and bespoke shelving all designed and manufactured from…

National Museum of Scotland – Learning Centre

The contract involved the manufacture and installation of glazed screens including necessary M&E services, IT services, security systems and building works provide acoustic separating within the Learning Centre at National Museum of Scotland, Chambers Street, Edinburgh.   The full works comprised: • Removal of existing…

HTA Design – Bridgeside House

The contract involved alterations and refurbishments to an existing office space within Bridgeside House on McDonald Road, Edinburgh. The full works comprised: • Removal works • Strip out of existing facilities along with ceilings, flooring, Partitions and M&E Services • Structural works • New internal…

Heriot Watt University – Flexible Labs

The contract involved the refurbishment of a space in the Heriot Watt University James Nasmyth Building. The contract involved partial refurbishment of existing Mechanical Engineering Laboratory to form flexible laboratory space. Rearrangement of existing basement below to form storage space for new laboratory. Space to…

Macs Adventure, Glasgow

The contract involved the alterations and the refurbishment of an existing office space within Skypark in Glasgow. The brief was to reflect the company’s core values of adventure, fun and innovation while providing a vibrant space where people want to come to work. The full…

University of Edinburgh, Mary Brück Cafe

The contract involved the alterations and the refurbishment of an existing cafe located within the Mary Brück building, the Kings Buildings campus, University of Edinburgh. The full works comprised: • General downtakings including removal of existing tables and seating, all furniture, various fitments, existing flooring…

Napier University, Triangle Cafe

The Triangle Café at Napier University was a 3 week contract that consisted of the stripping out and removal of existing steel handrails, flooring and sections of concrete wall and slab. New automatic sliding doors were placed in the entrance with advanced sensors that consisted…

Paterson’s Land Reception Area

The scope of works comprised of the refurbishment of an existing Reception Area for the University of Edinburgh to create a new reception for the Office of Lifelong Learning. Main works included minor M&E works, internal finishings, partitions, flooring, ceiling and decoration to existing space and…

Henry Prais Language Suite Refurbishment

The contract involved the complete strip out and refurbishment of the Language Suite comprising 3No Interpretation Suites, 1No Language Lab, 1No Self Study Facility and upgrading of corridors and associated stairs, to produce state of the art learning facilities with some of the most advanced…

Redevelopment of Bar and Restaurant

The contract involved the conversion of back of house office areas and existing bedrooms into a new Cocktail Bar area, the refurbishment of the Kitchen and Restaurant and formation of a new Hotel Reception facility. The works were undertaken whilst this premier city centre hotel…

Old Church Hall Conversion

This project involved the conversion of a run down Church Hall into a luxury residential property for a private client. The project was located in the busy city centre of Edinburgh with a mix of both residential and commercial neighbouring properties. The high quality specification…

Roxburgh Hotel Bar & Restaurant

This prestigious hotel is situated on the corner of Charlotte Square and George Street in the very heart of Edinburgh’s city centre. The successful delivery of this project was a great achievement, taking place in a fully functioning live hotel during the summer tourist season…

Calder House Refurbishment

This challenging project provided a complete refurbishment of the entrance/reception area and central stair core within a very busy regional office for Sykes, a global leader in providing reliable and innovative customer contact solutions. With the reminder of the building continuing to operate 24/7 throughout…

Confucius Institute Refurbishment

This refurbishment and alteration project involved the complete alterations of the second floor of the four storey Post Graduate Building at Riccarton Campus to convert existing office space into a New Teaching Facility. The project was sponsored by the Chinese Government. The new facility included…

North Esk Lodge – Changing Facilities

This refurbishment project for a valued client involved the refurbishment of the toilet facilities, showers and changing rooms on three floors within the Junior School at North Esk Lodge Musselburgh. The project was delivered during the school shutdown for the summer holiday period with a…

James Nasmyth Building, Alterations

The contract involved the complete strip out the existing workshop area and associated rooms to form a New Laboratory, Office and Stores Office. The remainder of the building was fully operational throughout the contract, with all IT and building services being maintained throughout. The works…

7 Lochside View Refurbishment

The contract involved the refurbishment of the reception area and an 820m2 ground floor office along with common circulation areas, toilets and central atrium within an office complex at the Gyle Business Park in Edinburgh. The remaining two floor of the building were fully operational…

Hope House, Office Refurbishment

The contract for Davidson Chalmers, one of Edinburgh’s most respected commercial law practices, involved the complete refurbishment of their office at Hope Street. The works comprised: M&E Alterations Manufacture and Install of Feature reception desk Installation of fabric wrapped panels with integrated AV to create…

Formation of New House Office

Over a programme of only 3 weeks, SJS created a brand new house office and reception foyer for the Pollock Halls Campus. A key aspect of this project was bespoke manufactured joinery, including an impressive oak slat wall, which now spans the complete length of…

Bilston Glen Reception Desk

SJS provided a full design, manufacture and installation service for the reception area upgrade at the vibrant serviced office facility at Bilston Glen Business Centre. The focal point of this project was the new feature reception desk comprising: • Corian countertops • Oak laminated units • Stainless steel…

Museum Reception Counter

SJS were delighted to be involved in this prestigious refurbishment project for one of the nation’s most historic buildings. From our bespoke joinery manufacturing facility, our talented designers and craftsmen created the bespoke pieces that our team installed to present a brand new venue in…

Manufactured Joinery Ten Hill Place

SJS produced the bespoke manufactured joinery components as part of our Main Contractor project delivering the Redevelopment of the Bar and Restaurant facilities at the Ten Hill Place Hotel for our client The Royal College of Surgeons Edinburgh. The Bar & Servery Counters and the…

Conversion of Office Units

This refurbishment project involved the conversion and refurbishment of 5No Commercial Units into 6No high quality two and three bedroom residential properties. The works were delivered in a phased manner with each flat being converted in an 8 week programme period resulting in the adjoining…

Advocates Close Serviced Apartments

SJS provided the design manufacture and installation of bespoke joinery for our client Interserve at the award winning Advocates Close Development in Edinburgh for the Chris Stewart Group. The bespoke joinery elements comprised: Feature wall panelling, Bed decks Wardrobes TV Housing Units Corridor wall panelling…

Manufactured Joinery – City Park

This bespoke joinery project consisted of the design, manufacture and installation of various complex elements for our client Sharkey at their project refurbishing the reception at City Park. The works comprised: Large laminated Corian reception desk Storage units Entrance wall panelling Feature glass wall Fitments…

Places For People, Joinery

SJS were employed by our valued client Sharkey to provide the design, manufacturing and install of the bespoke joinery elements of this stunning office Fit-out. The key focal points of this project were the walnut veneered reception desk and associated wall paneling. The full works…

Restaurant Screen and Feature Ceiling

The second phase refurbishment at The Dutch Championship Golf Club in Spijk, Holland, our most recent international project where we completed all of the manufactured joinery elements for our client Sharkey. The manufacturing works comprised: Feature wall panelling Custom Oak sliding doors Bar serveries Feature ceilings…

Tesco Lever Building, Joinery

SJS were delighted to provide the design, manufacture and installation of the bespoke manufactured joinery elements for our client Sharkey on their fit-out of this Modern office space. The manufacturing works comprised: 5 Kitchenette’s Multiple storage solutions Café tables Benches Reception desks Banquette seating Stained…

Box Office Refurbishment

SJS Property Services delivers a 5 Star Performance at the Festival Theatre, Edinburgh. The Box Office refurbishment project was completed swiftly to a 5 day programme. The fantastic Counter manufactured in our bespoke joinery facility is formed from LED backlit translucent Corian, allowing the colour…

Formation of New House Office

SJS produced the bespoke manufactured joinery components as part of our Main Contractor project delivering the New House Office at Holland House, Pollock Campus Edinburgh for our client University of Edinburgh. The key aspect of this project was the impressive oak slat wall, which spans…

Civic Centre display case

SJS designed manufactured and installed a trophy cabinet at West Lothian Civic Centre, Livingston to match an existing cabinet within the building. The cabinet, triangular in shape with a cherry laminate grain and clear laminated glass doors and shelving is a fine example of the…

Napier University Craiglockhart

The project for Napier University Craiglockhart consisted of the stripping out of 2 No existing office spaces and meeting rooms of 180sqft refurbishing it into a new and up-to-the-minute working environment. The full works comprised: Strip out of existing partitions along with installation of new…

Harley Haddow Fit-out

This 6,000 sq ft office fitout for Harley Haddow was located in the world famous Princes Street in the heart of Edinburgh. The project transformed the second floor of a six story office building into a new vibrant and modern work space. The new facilities…

Clean Rooms Laboratories

The contract involved the complete strip out, alteration and refurbishment of existing rooms to form Clean Room Laboratories G.50 – G.55, Service Rooms, Pass Lobby, Dirty Room and G.57 Office Accommodation on the ground floor of a three storey teaching building. The Clean Room laboratories…

Arnold Clark Refurbishment

Our four week contract with Arnold Clark at Fiat Paisley involved a strip out and refurbishment of their showroom floor and the repair works for the longstanding car park. The upstairs administration office was revamped to compliment the rest of the surrounding area. The works…

Aroma Café Dundee Refurbishment

This 3 week contract for Espresso Logic Consultancy involved the stripping out and refurbishment of the existing cafe area to form the new Aroma Café at Ninewells Hospital, Dundee. Building standard was met for electrical installation regulation and all associated pipe work was installed and…

The Hub Refurbishment

The brief for our project at The Hub was establishing a fresh and modern design to the box office, office, and toilets for Edinburgh International Festival on Castlehill, Edinburgh. Works included refurbishment of the male and female toilets and existing office space. Our Bespoke Manufacturing…

Loretto Golf Academy Project

The contract involved the transformation of an aged indoor swimming pool into The Loretto Golf Academy, a modern state of the art golf teaching facility. The 18th Century building had originally been the site of a tannery and had undergone a number of alterations over…

Laing the Jeweller George Street

SJS delivered a sparkling performance in delivering the fit-out and refurbishment for Laing the Jeweller at its new three story Flagship premises on 72 George Street, Edinburgh. Laings are Scotland’s oldest family jewellers having been in the jewellery trade since 1840. The finished store is…

Café Noir Refurbishment

The scope of works was stripping out and refurbishing an existing coffeehouse to form a warm and welcoming new café for our project Noir. Works included the renewal of the ground floor and basement food prep areas, stairs, hall, and toilets. The café featured the servery counter…

40 Torphicen Street, Joinery

SJS provided the bespoke furniture for the entrance of a new office space on 40 Torphicen Street for Robertson Construction. All elements were designed, manufactured and installed by the SJS team. The key focal points of this project were the American Black Walnut veneered wall…

SRM Glasgow College, Joinery

This 10 week contract involved the design, manufacture and installation of bespoke joinery elements for SRM’s Glasgow College. Oak veneer was featured on worktop surfaces for the reception desks. The store countertops consisted of a grey laminate with a steel angle trim on the counters…

Gracemount Leisure Centre

The bespoke joinery package for Gracemount Leisure Centre consisted of the design, manufacture and installation of various elements for our client Sharkey. The stunning new servery and reception desk featured a light oak veneer worktop that was used to compliment the matching doors in the…

Café Noir Palmerston Place

The bespoke joinery for our project at Café Noir was manufactured within our own state-of-the-art facility consisting of various elements that greatly complimented the overall design. The bespoke joinery elements comprised: Banquette seating Booth Seats Bar with marble tops Gantry Featured canopy   Click here…

Laing the Jeweller Bespoke Joinery

SJS delivered a sparkling performance in delivering the fit-out and refurbishment for Laing the Jeweller at its new three story Flagship premises on 72 George Street, Edinburgh. The finished store is of the highest quality and is now the jewel in the crown of Edinburgh’s…

Lyell Building Reception Desk

The elegant reception desk was designed, manufactured and installed by SJS at the Lyell Building, Heriot-Watt University. The black granite top with American crown cut white oak used throughout the design was the main key features of the bespoke furniture. The installation was delivered efficiently to…

WEST Brewery Function Suite

The bespoke joinery package for our project at WEST Courtyard consisted of the manufacture and installation of featured Walnut Veneer wall panelling, bar and Island unit with Hi-Mac worktop. This eye-catching transformation was delivered efficiently and on time.  

WEST Brewery Refurbishment

The works for this contract included the demolition of the existing lavatory block within the property including the removal and isolation of existing power, water and mechanical services to this area. There were various openings that were formed in the existing walls to help create…

Tanfield Bespoke Joinery

The bespoke joinery package for our contract at Tanfield, Edinburgh involving the alterations and refurbishment of the existing internal common areas along with the remodeling of the external landscaping and the introduction of new internal landscape features, all designed to create a modern and vibrant…

Tanfield Refurbishment

The contract involved the alterations and refurbishment of the existing internal common areas along with the remodeling of the external landscaping and the introduction of new internal landscape features, all designed to create a modern and vibrant working environment. The site was an existing multiple…

2 Castle Terrace Refurbishment

Our contract for Knight Property Group at 2 Castle Terrace consisted of six levels that were altered to accommodate for new office space. The works included the formation of a new reception area on the ground floor.  Throughout each level there was new raised flooring,…

Milk Factory Refurbishment

The contract involved the converting of an 11,000ft2 former milk factory in Leith transforming it into a luxury private residential dwelling and separate live working space for the clients. The roof in the centre of the building was stripped away to create an inward-facing courtyard…

Falkirk Wheel Refurbishment

Creating a bright innovative space this 16 week project involved the alteration and refurbishment to enhance the Falkirk Wheel main visitor attraction centre and the New Port Downie building as part of a series of various improvements during the winter of 2015/2016. Overall works included…

Milk Factory Bespoke Package

The majority of the bespoke joinery for our contract at the Nestlé’s Milk Factory in Leith was all manufactured using old reclaimed timber joists that dated over 100 years and was restored to provide new furniture and fitments for the three story residential area. The…

Falkirk Wheel Bespoke Joinery

All furniture and fitments were designed and manufactured in-house and fitted into the bright innovative space for our 16 week project at the Falkirk Wheel. The main visitor attraction centre and the New Port Downie building was part of a series of various improvements during…

Brewster Laser Labs, HERIOT WATT UNIVERSITY

The contract involved the refurbishment of a space in the Heriot Watt University David Brewster Building to all the formation of new Laser labs. The contract involved major mechanical and electrical services overhaul which included specialist refrigeration and cooling systems vital for the operation of…

Forth Children’s Theatre

SJS Property Services were proud to have given our time and material contribution to help assist Forth Children’s Theatre (FCT) in manufacturing stage props for their set Jesus Christ Super Star that was performed in August at Edinburgh Tabernacle.

Medical School, Teviot UoE

This project involved the complete refurbishment of existing teaching spaces at the Medical School for the University of Edinburgh at the prominent Teviot Building in the centre of Edinburgh.  The transformation created new vibrant facilities incorporating the latest technology teaching equipment and services.  The project…

Cockburn Museum UoE

The scope of works comprised of the alterations and refurbishment to the existing Cockburn Museum (Level 3) for the University of Edinburgh. Main works included minor M&E works, internal finishing’s, partitions, flooring, ceiling and decoration to existing museum space and kitchen. Special care was required…