Description:
This construction project comprises of fit-out and refurbishment works to the existing premises of a two story office building within the grounds of the main Nine BioQuarter.
The full works comprised:
- Small power / data installation / alterations
- Alterations of existing light fittings
- Alterations to light switching / controls
- Installation of staff café / tea-prep
- Installation of storage wall
- Installation of metal stud and glazed portioning (including structural supports)
- Decoration throughout
- New floor coverings throughout
SJS worked well to deliver this two-story office fit-out in a live working environment. Great planning and teamwork enabled this project to be delivered with minimal disruption. SJS manufactured bespoke joinery throughout this project, which was completed to a high standard and compliments the newly designed office.


