Office Fit Out, Exchange Plaza

The 18,000ft2 project comprised of a full strip out and subsequently the CAT A office fit out within Exchange Plaza, Edinburgh.

The works comprised of the strip out of former tenant fixtures and fittings along with suspended ceilings and floor finishes. The suite was thereafter fitted out to the client’s office specification including new lighting, fan-coil ventilation, small power and data. Glazed and plasterboard partitioning was installed to subdivide the space, creating several meeting rooms. Bespoke manufactured storage cabinets and set-down areas were designed and manufactured in our manufacturing facility and installed on-site.

The works took place on the 2nd floor of a multi occupied office building in the centre of Edinburgh. With surrounding floors remaining fully operational, the works were carefully co-ordinated with noisy works taking place out of hours, ensuring third parties were uninterrupted.

Location

Exchange Plaza

Duration

16 weeks

Dates

Feb 19 - Jun 19

Date

July 19, 2019

Category

Projects