Full fit out of ground and lower ground of the premises along with a CAT A fit out of the mezzanine area. Main ground floor ‐ incorporate the formation of new wellbeing rooms, gym, toilet and shower areas.
Ground floor works –new separate retail unit
Lower ground floor – Structural works to incorporate a new lower floor area
Full works Comprising:
- Structural works
- New platform style lifts installed/reception lifts
- Part structural partitions
- New glazed screen systems, ceilings, acoustic raft
- Underfloor heating to toilet and shower areas
- Bespoke fixtures and fittings/reception desk
- Incorporation of new M&E design throughout (heating, ventilation, drainage, lighting FA’s power, data, heating and security)
- New flooring, floor finishes, decoration and wall finishes throughout
- New bike store and wash facility to lower ground
- Branding and signage
- New raised access floor
- New toilet facilities throughout
- Cladding to perimeter walls and soffits with services incorporated


