LogoLogoLogoLogo
  • Home
  • About Us
  • Services
  • Our People
  • Case studies
  • News
  • Careers
  • Contact
  • Home
  • About Us
  • Services
  • Our People
  • Case studies
  • News
  • Careers
  • Contact
Project

2 Castle Terrace Refurbishment

Our contract for Knight Property Group at 2 Castle Terrace consisted of six levels that were altered to accommodate for new office space. The works included the formation of a new reception area on the ground floor.  Throughout each level there was new raised flooring, suspended ceilings, toilet layouts, cupboards and tea prep areas installed. New shower rooms were placed in the basement incorporating new mechanical and electrical connection to an existing room. A fresh passenger lift was installed with floor finishes and decoration works carried out throughout all floors. A bike and passenger lift was fitted externally.

The full works comprised:

  • Strip out of existing facilities along with suspended ceilings, raised flooring, and M&E services
  • Feature Lighting
  • New ceilings, wall panelling and glazed entrance screens
  • Floor finishes by Phoenix Flooring Services Edinburgh
  • Decoration
  • New shower rooms and toilets
  • New cupboards and tea prep areas
  • Bike and passenger lift installed

All works were carried out within normal working hours with minimal disruption to existing offices and businesses.  Daily discussions between the relevant parties and ourselves were arranged to ensure any works being carried out were agreed and all relevant parties made aware.

CLIENT

Knight Property Group

LOCATION

Edinburgh

VALUE

£920k

DURATION

20 Weeks

Date

Jan-May 2016

Date

April 1, 2014

Category

Projects

Contact Us: 0131 653 1234

© SJS Property Services Ltd, Newhailes Road, Edinburgh, EH21 6SY. Company Registered in Scotland: SC201577. VAT Number: 101 9995 07

FAQs | Privacy | T&Cs | Cookies